Strengthening India's power grid, end to end.
High-voltage transmission lines, substations and distribution networks — connecting generation to consumption with reliability and precision.
Rayax Infra LLP is building its Transmission & Distribution vertical to support India's power grid — from high-voltage transmission lines to substations and distribution networks. As a new entrant to this sector, we are structuring our teams and processes around the technical and regulatory standards this work demands, from 66kV feeder lines to 765kV transmission corridors.
T&D projects span long, geographically dispersed corridors and require precise route engineering, RoW management and specialised tower-erection and stringing capability. We are assembling in-house line-design engineers and experienced site crews, and building working relationships with state transmission utilities and DISCOMs, so we can deliver evacuation infrastructure reliably from our very first project.
End-to-end power infrastructure capabilities across transmission, substations, distribution networks and renewable grid connectivity.
Five stages, one accountable delivery process, from route survey and engineering to testing and energisation.
Line survey, tower spotting and detailed engineering for the transmission or distribution route.
Right-of-way acquisition support and statutory forest/environmental clearances.
Tower foundation construction followed by structural erection to design specification.
Conductor/OPGW stringing and parallel substation civil, electrical and automation works.
Protection-system testing, line/substation commissioning and energisation with the utility.
Every project in this vertical is engineered and executed in line with the following codes, standards and regulatory frameworks.
What sets our transmission infrastructure delivery approach apart, from high-voltage capability and integrated execution to renewable grid connectivity and compliance.
Engineering processes built to handle projects from 66kV through 765kV.
Civil, tower erection and conductor stringing planned under a single contract.
Interconnection engineering designed to support solar and wind evacuation infrastructure.
Site teams led by professionals experienced in tower erection and stringing works.
A structured approach to engaging state transmission utilities and DISCOMs.
Processes aligned with CEA regulations and grid-code requirements from day one.
Connect with our transmission and distribution team to discuss your project requirements.